More and more people are asking for service and CO2 optimisation in meeting room environments - both in the private and public sector. In addition, requirements have been tightened for indoor environments. We are therefore restructuring and creating a service department to handle this.
In addition, we have recently worked on many different projects in Air Engineering:
Facilities for genetic engineering production
For one company we have been involved in the renovation of a barrier with cooling and room pressure control requirements.
We have been involved in the project from start to finish, providing advice, planning, project proposals, coordination, drawing and installation.
The plant is now fully functional and the customer is well satisfied.
HRS in Kalundborg has 3 large ventilation systems
In the new extension of the Kalundborg department, we have installed 3 ventilation systems ourselves.
In the forging halls, a process furnace with welding arm and room ventilation has been installed, and the accounts have been prepared for room ventilation and heat pump.
Here, one of the installations is lifted into place by a crane that can reach out 60 metres.
Better indoor climate in classrooms
We have several smaller projects underway for ZBC. Among other things, we have helped move an electronics room from Slagelse to Ringsted and installed a decentralized system in a classroom in Næstved.
In ZBC Slagelse we have optimized and installed a new auto-gas extraction system in the students' car workshop, thus ensuring a better indoor teaching climate.